Probabilistic
Design of Structures/ Structural Reliability/ Risk and Reliability of Civil
Infrastructure Systems CE41002/CE51002/CE60108/CE60112 |
||||
|
Spring 2012 |
Instructor: B.
Bhattacharya |
|||
|
Office: CE 304 |
Email: baidurya@iitkgp.ac.in |
|||
|
Required text |
·
Structural Reliability Analysis and
Prediction, Robert E. Melchers, Wiley, 1999 (ISBN 0471983241) |
|||
|
Recommended reading: |
· Probability Concepts in Engineering Planning and Design, Vol. I, A. H-S Ang and W. H. Tang, Wiley, 1975 · Introduction to Reliability Engineering, 2nd Ed., Lewis, Wiley, 1996 (ISBN 0471018333) · Probabilistic Risk Assessment of Engineering Systems, Stewart and Melchers, Chapman and Hall 1997 (ISBN 0412805707) |
|||
|
Syllabus |
||||
|
Week |
Days |
Topics |
||
|
1 |
Jan 2 – 6 |
Introduction and overview. Review of basic probability |
||
|
2 |
Jan 9 – 13 |
Random variables, probability laws, common probability distributions – origins and interrelations |
||
|
3 |
Jan 16 – 20 |
Functions of random variables. Joint probability distribution, conditional distributions. Joint Normal distribution |
||
|
4 |
Jan 23 – 27 |
Random number generation – Monte Carlo simulations |
||
|
5 |
Jan 30 – Feb 3 |
Concept of stochastic processes |
||
|
6 |
Feb 6 – 10 |
Application of stochastic simulations in engineering problems |
||
|
7 |
Feb 13 – 17 |
Application (contd.) |
||
|
8 |
Feb 20 – 24 |
MIDTERM Week (Feb 17 – 24) |
||
|
9 |
Feb 27 – Mar 2 |
Formulation of structural reliability problems: limit
states |
||
|
10 |
Mar 5 – 9 |
First order reliability methods, importance sampling and
other variance reduction techniques |
||
|
11 |
Mar 12 – 16 |
Reliability – historical development, applications,
different measures of reliability; Component reliability - time to failure |
||
|
12 |
Mar 19 – 23 |
Reliability-based maintenance |
||
|
13 |
Mar 26 – 30 |
System reliability - representation of failure, series and
parallel systems, redundancy, fault
trees |
||
|
14 |
April 2 – 6 |
Probability-based acceptance criteria: consequence of failure, concepts of risk, utility |
||
|
15 |
April 9 – 13 |
Probability-based design. Calibration of target
reliability: reliability-based design codes |
||
|
16 |
April 16 – 20 |
Review |
||
|
17 |
April 23 – 27 |
FINAL Week (April 20 – 27) |
||
SF:
20/1 – 23/1; Republic Day 26/1; Kshitij: 27/1 – 30/1; Milad un Nabi 5/2; Holi
8/3; Mahavir Jayanti 5/4; Good Friday 6/4;